Things are progressing along relatively smoothly. The work I’m tackling is to cut the housings on the ceiling perimeter frame, mawari-buchi, for the ceiling cross bars, or sao-buchi. There are two housings in fact, a lower one for the exposed portion of the frame, and an upper one which keeps the frame from any tendency to twist, which would make for gaps in the housing in the exposed portion, were it to occur:

I have a piece of sao-buchi cutoff to use a a checking device for each connection, albeit, only for checking the exposed housing fit:

The ends of the actual ceiling rods, already cut, have a stepped arrangement so as to fit both housings on the perimeter frame.

Fully down and the fit seems to have come out okay:

There’s a little pencil mark left on the bottom which needs to be removed. The exposed faces of the mawari buchi have yet to be chamfered and finish planed, and that will take care of marks like that.

There are 24 housings to complete in total.

I guess it wouldn’t hurt to show a reflected ceiling view so readers can have a better idea as to the overall scope of work:

It is a standard aspect of Japanese traditional architectural design to produce a reflected ceiling view for a house, as ceilings vary from location to location within a structure. They are an elaborated aspect, and one that surely deserves to be drawn upon more by western builders. I’m hoping to have the chance to build more ceilings, like this one, and other designs.

As an example or such a plan, here’s a reflected ceiling/roof framing plan from the main temple building at Shakuō-ji Temple:

Another from the Goten at Nagoya Castle:

Anyway, where was I? Oh yeah….

After the perimeter frame members were mortised, I ran them through the shaper, climb-cutting with the feeder, to chamfer the outside lower arris:

The chamfer:

Frame work completed, I could start reassembling the ceiling frame for the last time, starting with the perimeter frame, miters adjusted for final fit, and then the long sao-buchi go in:

The junction of ceiling frame member with perimeter frame mortises is provided with a degree of slop on both ends to allow for any variances in the walls, beyond which I have already accounted:

I hope the above photo makes clear the nature of the stepped end cut on the ceiling rod and the two mortises in the perimeter frame member.

An overview of the completed ceiling framework all assembled:

Another view:

At last the panels could be fitted:

Then a weird thing happened. There are 44 panels in this ceiling and I was sure I had prepared 44 pieces, however today there seem to be only 43 pieces. I cannot account for this shortfall, other than with my wallet, ahem, as I need to pick up some more Western Red Cedar tomorrow and fabricate another panel.

Install is scheduled for the middle of next week. After fitting the remainder of the panels, I have to make some small frames for the light wells, and then repaper 3 shōji. Almost done.

Thanks for coming by the Carpentry Way. Post VI follows.

4 Replies to “The Well of Heaven (V)”

  1. Awe inspiring! Hard to find satisfaction in plain white ceilings after looking in on this. Thank you for the overview, I had originally wondered how you would account for the corners being out of square, I see that the perimeter frame is made to match those corners and the interior frame is made square, then the two matched up with an offset to account for the difference? Happy New Year!

  2. Brian,

    most kind of you! Happy New Year to you too!

    You are correct in surmising that I set up the perimeter frame to match the room condition, then centered the grid of interior framing atop that perimeter, which was vaguely trapeziodal, as best I could.

    ~C

  3. Chris, Happy New Year To you, your family and of course your readers. I surmise you will find the 44th panel…….after purchasing the cedar and have made it's replacement panel…That's the way it works around here.

  4. Joe,

    many thanks! Besides that missing panel, there was another which had developed a split while it had been sitting in the pile of panels, so, I decided to replace it as well rather than glue the split. I bought enough WRC yesterday to finish off the panel work.