Gateway

The Museum of Fine Arts in Boston is one of the premiere museums in the United States, if not the world. I’ve visited there many times for various reasons – there’s so much to see! They have a superb collection of Japanese swords and guards for instance, and a temple room constructed by Japanese carpenters in the 1910’s which houses Buddhist sculptures and paintings.

A few years back I learned that there is a 10,000 square foot Japanese dry stone landscape type of garden located at an exterior corner of the museum’s main building, a garden called Tenshin-en. The word means ‘Garden at the Heart of Heaven’, though in some ways this is but a happy coincidence as the garden was actually named after a person of the same name, Okakura Tenshin, aka Okakuro Kakuzō, the author of The Book of Tea. Okakura-san was the curator of the MFA’s Asiatic collection in its formative period.

The garden was funded and constructed in 1987, here’s a look at part of it:

The perimeter of the garden is bounded by a masonry wall and has a kabukimon, or ‘crown beam gate’ at the entrance and a small roofed kiosk to the left:

The gate was fabricated in Kyoto out of Hinoki and then brought over and assembled by Japanese carpenters.

A closer look:

A view of the inside gate area in wintertime:

I’m not sure precisely what unfolded, but somehow the gift of the garden fell organizationally between a few cracks at the MFA, not quite the purview of the Asian Art Department nor the Facilities and Maintenance Management side. There was no plan in place for maintenance and upkeep, and as many of you know, Japanese gardens are quite maintenance intensive. After 25 years or so, the garden was not in the best condition, and the gate was highly deteriorated. Here’s a few recently taken close-ups of parts of the gate to give you a sense:

Posts are being eaten by fungi:

 

I’m being gentle with these photos – there are worse looking parts yet. The posts on the kiosk have also deteriorated to the point where they will require replacement, though, thanks to the roof, the rest of the kiosk is in excellent condition.

25 years is not a very long lifespan, though it is about what one might expect for a wooden structure in that material placed largely out in the elements. While there is some copper flashing on the gate, it is on the minimal side and certain aspects of constructional detailing have made the gate more prone to detrioration than otherwise.

I believe the main posts are pretty much shot through with rot and the gate’s structrual integrity is definitely waning. The gate doors are toast.

After I saw the gate for the first time in 2009, I tried to contact the right people at the museum to let them know the gate was in a perilous state and offer my services to repair or rebuild it. I got nowhere after repeated attempts, ending up with a “we’ll keep your information on file” .

So I put the gate towards the back of my my mind and moved on. Last year, I was looking at webpages on Julie Masservy Moir’s site to see what she was up to of late, and saw a picture which showed a crew of people who had been engaged in pro bono clean up work on the Tenshin garden. I realized that Julie, who is based in New Hampshire, would likely know which MFA staff members had some oversight of the gate and garden, so I followed that up and thanks to Julie’s introduction, a few weeks later I had a meeting at the MFA with staff there to discuss the gate condition. My persistence had paid off.

That meeting led to a request for a proposal for a new gate, a document in which I also detailed some ways we could make a longer-lasting kabukimon construction, and suggested a maintenance schedule for the long term. Many months later that proposal was put together with several others concerning the garden and submitted to a funding entity in Japan. Then we waited many more months. Eventually, word came a couple of months ago that the funding had come through!

Several more months have since passed, and after many hurdles have been crossed, everything looks to be a ‘go’. I’ll be meeting with staff at the MFA in the 3rd week of this month to discuss things further in terms of scheduling.

Since more months have elapsed than anticipated as this process has rolled along, the projected installation date for the new gate has been pushed to April of 2015.  The timing is to coincide with the seasonal opening of the garden. It will mean that fabrication will take place during the fall-winter period of 2014.

Now, part of what will stretch out the time frame for this project is the wood. We will be using Port Orford Cedar, and since the gate requires some largish sections the time it will take to properly dry them out is going to be on the scale of several months. The longer the better really. I anticipate doing most of the drying using dehumidification, which is a gentle and slow process, and there is a facility a mile or two up the road from my show with a large dehumidification room.

I will endeavor to reclaim material from the old gate to use in the new one, though I fear the amount salvageable will be modest. Put it this way: I am planning for the worst, and hoping for the best in that regard. I’m anticipating a trip to Oregon in the next month or two to look at some Port Orford logs at a mill there.

I’m delighted to have the opportunity to design and build a traditional Japanese wooden structure – especially one that will be publicly viewable. I’m excited to have a chance to engage in a project with a prestigious museum as well, and look forward to seeing this project through to a successful completion. Also, unlike many recent projects, I will likely not have a non-disclosure agreement to deal with, as the museum is a non-profit entity, and I should be able to blog about the construction and installation.

Thanks for coming by the Carpentry Way. On to post II.

12 Replies to “Gateway”

  1. Congratulations! I'm looking forward to reading about how this progresses. Your excitement must be pretty great. It will put you on a path toward many more such opportunities.

  2. Hi Chris! Hey this is great news, I'm very much looking forward to your thoughtful restoration of the gate! And hats off to your persistence in finding the right folks to help them out. 2015. wow, it might seem a long way out but i know if i had the job, my mind would be racing about trying to find the wood, and then think through the process.

    Doubly so given your dedication towards reusing existing material. I think that just speaks volumes about how the museum has the right craftsperson for the work. Definitely want to feature the old wood in the new work. There is no English term for it but maybe in some other language: old wood mated to the new wood in a way to “bridge” and allow for continuity…only analog i can think of is with dog ownership, and how you have an older dog who will not last much longer, so you get a puppy, and somehow that overlap between lives makes everyone comfortable: the elder dog has a young'un to lick, the puppy has a role model, and the owner/steward has a more graceful transition. Sorry, i'm just waxing on because my neighbor just had to have his dog put down and now he's without a companion and so that's where my mind is….

    anyway, best to you and this new work. I love watching your blog, you always have something interesting going on.

    -Adam of Oakland, CA

  3. This is exciting, Chris! I look forward to seeing some elegant mortices cut in some beautiful wood.

    Tom

  4. Tico,

    nice to hear from you and I also have some hope that this project may be a springboard to other opportunities. Thanks for your kind comment.

    ~C

  5. Joe M,

    I absolutely will do that, though I expect there won't be significant work on this project until about a year from now. I'll no a bit more about where things are going after the meeting later this month.

    ~C

  6. Adam,

    many thanks for your positive comment. I've already had a fair amount of time to have the mind racing and thinking about every avenue of development with the project, however now that the project scheduling has been set further back, and the wood already figured out, I would say I am at a more relaxed frame of mind.

    As I mentioned, it would be great to re-use old gate material in the new gate, and at this point my expectation is that the amount of reclaimable wood is not going to be very much at all. There is also the juggling of timing for removing the old gate, a period where there is no gate (and some sort of temporary entrance in place), and the installation of the new gate which affects the reclaim question, and this has yet to be resolved. I will plan the construction as if there will be no reclaimable stock, and will happily use any that I can reclaim should that possibility arise.

    ~C

  7. Chris, when I read you were successful about rebuilding the gates I was really excited for you. After such a long period of waiting I can imagine the joy you felt when after such a long time. As you found out with so much of this type of work finding the right contact can be everything and you eventually contacted that right person.
    I have seen your work over many years and there no doubt they have been lucky to acquire your skills for the project.
    On the flip side you may need to buy a few more Martin machines to help in the project.
    Sinjin

  8. thanks Tassos,

    and please be patient in regard to future installments as not a lot is likely to happen with this project over the next several months. Whatever does happen though, you'll read about it here first.

    Thanks for your comment.

    ~C

Leave a Reply to Angostura BittersCancel reply

error: Content is protected !!

Discover more from The Carpentry Way

Subscribe now to keep reading and get access to the full archive.

Continue reading